Boyle Construction

Boyle Construction

Project Profile

Metro Beauty Academy

Wescosville, Pennsylvania

Client
CSGM Real Estate Development
Contact
Mr. Gary Menzies
Consultants
Fedetz & Martin Associates (original architect)
MKSD Architects (addition/ renovation architect)
D. Scott Bigley, P.E.
Ott Consulting, Inc.
Services
Construction Management, Design-Build
Final Cost
$1,791,400 (original)
$1,100,000 (addition/renovation)
Project Completion Date
2007 and 2012

Project Description

Boyle provided design-build services for the brand new, 12,000 SF, state-of-the-art Metro Beauty Academy training and wellness facility. Services included all site work, including parking lot paving and landscaping, and design-build construction of a two-story training facility with 9,000 SF on the first floor and 3,000 SF on the second floor. Interior spaces include a coffee bar, toilet rooms, a teacher’s lounge, a student lounge, a product dispensary, storage, a reception area and multipurpose and stylist classrooms.

The Metro Beauty Academy utilizes an open design concept, uniting spaces with a visual connection and features a triangular truss throughout the large studio area. Two-story glasswalls allow the public to see students working inside, and shading devices outside the curtainwall diffuse natural light inside.

In 2012, Boyle again provided design-build construction manage-ment services for a 4,400 SF addition and renovations to the Academy. The addition added space for an esthetics classroom, a computer lab, a cafeteria and offices. Renovations were performed on the existing multi-purpose and stylist classrooms.