Project Profile

Hatfield Township Aquatic Center

Hatfield, Pennsylvania

Client
Hatfield Township
Contact Name
Ms. Stephanie Teoli Kuhls, Former Township Manager
Consultants
MKSD Architects
Councilman Hunsaker & Assoc.
D. Scott Bigley, P.E.
Snyder Hoffman Associated, Inc
McCloskey & Faber, P.C.
CKS Engineers, Inc.
Services
Agency Construction Management
Contracts
Public procurement, multi prime, 6 - Prime contractors
Final CM Budget
$5,325,000
Base Bids
$5,155,066
Total Change Orders
$88,552
Percentage Change Orders
1.7%
Final Costs incl. C.O.s
$5,243,618
CM Services Start Date
October 2005
Construction Start Date
September 2006
Project Completion Date
May 2007

Project Description

Boyle oversaw site work, development and construction of a new municipal Aquatic Center. The total pool water surface is approximately 15,000 SF with a 7,000 SF bath house.

Site work included demolishing an existing pool, partially clearing a wooded site, installing water service and the storm water system, curbing and a new walking path and sidewalks. The bath house was constructed of all masonry with brick veneer and EFIS exterior, architecturally-exposed wood trusses and asphalt shingles. The interior includes circulation desks, an office, locker and shower rooms, a mechanical/pump room and a 1,000 SF snack bar.

The pool consists of two separate bodies of water. The competition pool is approximately 7,000 SF and includes diving wells and a movable bulkhead. The leisure pool is 8,000 SF and includes a zero (or beach entry) tot play area, current channel, family slides, two 100-foot-long flume slides and a hydro therapy area.