Work continues on the 18,000 SF Pepsi warehouse expansion project off Lehigh Street in Allentown. The project will add increased ceiling height to maximize storage capacity and a new fire alarm and sprinkler system. Thanks to a strong partnership and collaboration with the owner, we’ve been able to develop and execute complex schedules and logistics plans while keeping the building fully operational.

← Boyle Named to the MidAtlantic Top 50 Contracting Firms by Engineering News-Record New Neighborhood Hospital Coming to Tannersville →
The Boyle360 Advantage
Boyle360 is an early-stage project partnership from Boyle Construction that brings collaboration, owner-side insight, and strategic planning into your project before design begins, helping you make smart decisions, control costs, and reduce risk.
Learn More