Growing need for space

The Primo Produce project included a 40,000 SF expansion of their cold storage warehouse, including a top of the line processing area that was to clean room specs. The office expansion added a 3 story, 16,500 SF office addition adjacent to their existing office and warehouse space. Working adjacent to existing, occupied buildings was very challenging. Both were executed without impacting Primo's existing operations in anyway. The team accomplished this with careful logistics planning and at some junction points erected temporary enclosures and elaborate protection systems.

Client: Primo Produce
Project: Primo Produce Warehouse
Location: Bethlehem, Pennsylvania

Explore.

The Boyle360 Advantage

Boyle360 is an early-stage project partnership from Boyle Construction that brings collaboration, owner-side insight, and strategic planning into your project before design begins, helping you make smart decisions, control costs, and reduce risk.

Learn More